Project: China State Grid Zibo Maqiao Substation 220Kv 110Kv
Construction Date: 2020
Building Area: 4,000 m² (steel structure prefabricated building)
Construction Location: Maqiao, Huantai
Project: China State Grid Zibo Maqiao Substation 220Kv 110Kv
Construction Date: 2020
Building Area: 4,000 m² (steel structure prefabricated building)
Construction Location: Maqiao, Huantai